Cozy Search
Chapter Selection
- Chapters (52)
- Completed: (43)
- 00. Preparation (12)
- 01. Description & Introduction (1)
- 02. Bill of Materials (2)
- 03. Education (4)
- 04. Fuselage Bulkheads (5)
- 05. Fuselage Sides (5)
- 06. Fuselage Assembly (2)
- 07. Fuselage Exterior (1)
- 11. Elevators (1)
- 12. Canard Installation (1)
- 13. Nose, Nose Gear & Brakes (7)
- 14. Center Section Spar (4)
- 16. Control System (1)
- 19. Wings, Ailerons & Wing Attach (4)
- In Progress: (11)
- Not Started: (1)
- 22. Electrical (1)
- 25. Finishing (1)
- 26. Upholstery (1)
- Completed: (43)
- Uncategorized (7)
- Chapters (52)
Archives
- March 2018
- May 2017
- January 2017
- February 2016
- January 2016
- April 2015
- August 2014
- January 2014
- October 2013
- July 2013
- February 2013
- December 2012
- October 2012
- June 2012
- May 2012
- April 2012
- February 2012
- January 2012
- December 2011
- November 2011
- October 2011
- September 2011
- August 2011
- July 2011
- June 2011
- May 2011
- April 2011
- March 2011
- February 2011
- January 2011
- December 2010
- November 2010
Meta
-
Join 93 other subscribers
Chad Wilhelm’s Cozy Build
Category Archives: 14. Center Section Spar
Chapter 14 – Spar (Mounting into the Fuselage) – 41 Hours
A bit of a break, with planning a wedding, new job, moving, and having a baby! The latter will continue to keep progress at bay to an extent, though a well received one. Started working on fitting the spar into … Continue reading
Posted in 14. Center Section Spar
Leave a comment
31 Hrs – Ch 14 – Main Spar
Cut the angle on the edges of the fore face of the spar and sanded. I then cut out the foam for the seat belt brace blocks and mirco’d them in place. Used duck tape to keep them in place … Continue reading
Posted in 14. Center Section Spar
1 Comment
88.5 Hrs – Ch 14 – Main Spar
Cut out the foam pieces for the main spar section after getting together all the foam needed. Finished cutting the foam pieces to size and contoured the ends of the spar on CS2 and CS4. Microed the 3 pieces of … Continue reading
Posted in 14. Center Section Spar
2 Comments
13 Hrs – Ch14 – Main Spar
During some down time while I was waiting for some parts, I decided to get a head start on creating the jig box for the main spar, coming up in Chapter 14. Cut out and assembled all the pieces for … Continue reading