Category Archives: 14. Center Section Spar

Chapter 14 – Spar (Mounting into the Fuselage) – 41 Hours

A bit of a break, with planning a wedding, new job, moving, and having a baby!  The latter will continue to keep progress at bay to an extent, though a well received one. Started working on fitting the spar into … Continue reading

Posted in 14. Center Section Spar | Leave a comment

31 Hrs – Ch 14 – Main Spar

Cut the angle on the edges of the fore face of the spar and sanded.  I then cut out the foam for the seat belt brace blocks and mirco’d them in place.  Used duck tape to keep them in place … Continue reading

Posted in 14. Center Section Spar | 1 Comment

88.5 Hrs – Ch 14 – Main Spar

Cut out the foam pieces for the main spar section after getting together all the foam needed. Finished cutting the foam pieces to size and contoured the ends of the spar on CS2 and CS4.  Microed the 3 pieces of … Continue reading

Posted in 14. Center Section Spar | 2 Comments

13 Hrs – Ch14 – Main Spar

During some down time while I was waiting for some parts, I decided to get a head start on creating the jig box for the main spar, coming up in Chapter 14. Cut out and assembled all the pieces for … Continue reading

Posted in 14. Center Section Spar | Tagged , | Leave a comment