24 Hrs – Ch12 – Canard Installation

Dennis Oelmann delivered the replacement canard, and it looks great!  I do have a problem with the lift tabs fitting in the fuselage, but that appears to be my fault.  I misunderstood the plans and reduced the sides by 3/8″, … Continue reading

Posted in Uncategorized | Tagged , , , | Leave a comment

13 Hrs – Ch14 – Main Spar

During some down time while I was waiting for some parts, I decided to get a head start on creating the jig box for the main spar, coming up in Chapter 14. Cut out and assembled all the pieces for … Continue reading

Posted in 14. Center Section Spar | Tagged , | Leave a comment

21 Hrs – Chapter 13 – Nose and Nose Gear

After some discussion on the forums about how to go about floxing the strut into the castering wheel assembly, it sounds like it is better to add some BID to the very tip of the strut to make it bulbus, … Continue reading