39 Hrs – Ch 13 – Fuselage Nose

I used duct tape to dam up the sides where I cut through to reposition.  Mixed up pour foam and added in the void.  I opted to do this instead of micro and foam scraps since it will be much … Continue reading

Posted in 13. Nose, Nose Gear & Brakes | Tagged | Leave a comment

10 Hrs – Ch00 – Garage Preparation

Created the workstation on wheels from the Tony Bingelis book “The Sport Plane Builder”.  I made mine a little bigger to match my available space and tools.  Tony shows 30″ x 30″, but I chose 30″ x 48″.  Turned out … Continue reading

Posted in 00. Preparation | Tagged | Leave a comment

13 Hrs – Ch12 – Canard Install

Fabricated the small piece that fits between the canard and the torque tube to block the inrush of cold air.  Epoxied it in place and put one layer of BID on each side.  Trimmed them up after cure, and checked … Continue reading

Posted in 12. Canard Installation, 13. Nose, Nose Gear & Brakes | Tagged , , , | Leave a comment