Monthly Archives: June 2011

Chapter 04 – 21.25 Hrs – Bulkheads

Used the Rockwell saw to trim the thick layers on the side of the LG bulkhead.  Then removed all the foam on the instrument panel above the leg holes with the scraper blade that came with the Rockwell saw.  In … Continue reading

Posted in 04. Fuselage Bulkheads | Leave a comment