Chapter 00 – 8 Hrs – Insulation and rewiring

Wrapping up the insulation and electrical rewiring, and getting ready to put up wall board.  Looking forward to getting some plastic on the ceiling, and getting the wall board up on the walls.  Then I can get ready to put … Continue reading

Posted in 00. Preparation, Completed: | Leave a comment

Chapter 00 – 12 hrs – Garage Preparation

I’ve been busy out in the garage!  I ran and wired new electrical to support 6 additional outlets.  (Garage was severely underpowered.)  Currently working on rewiring the existing wiring so it is all tucked behind the studs so I can … Continue reading

Posted in 00. Preparation, Completed: | Leave a comment