Category Archives: 12. Canard Installation

13 Hrs – Ch12 – Canard Install

Fabricated the small piece that fits between the canard and the torque tube to block the inrush of cold air.  Epoxied it in place and put one layer of BID on each side.  Trimmed them up after cure, and checked … Continue reading

Posted in 12. Canard Installation, 13. Nose, Nose Gear & Brakes | Tagged , , , | Leave a comment