Chapter 4 – 6 hrs – Bulkheads

Floxing Hard PointsCompleted the aft side of the firewall.  Cut out the hard points at 2″ square, and floxed into place.  (The plans say 1″ square, but builders have been reporting troubles aligning the engine mount, and making the engine mounts closer to 1.25″ to 2″ seems to be more practical.)  Finished up with one ply of BID.  After cure, I drilled and countersunk holes in preparation for glassing the rear side.

Installing Hard Points

Finished FirewallFloxed the screws into the holes and covered with 1 ply of BID.  Covered with peel-ply.

Advertisements

About Tarmac Grazer

I have recently purchased Cozy MK IV Plans #1627, and will be using this blog to log my build progress.
This entry was posted in 04. Fuselage Bulkheads. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s