Chapter 00 – 12 hrs – Garage Preparation

I’ve been busy out in the garage!  I ran and wired new electrical to support 6 additional outlets.  (Garage was severely underpowered.)  Currently working on rewiring the existing wiring so it is all tucked behind the studs so I can insulate and tack up some OSB.  The garage is quite full of “stuff”, and working around it has been a challenge to say the least.  Making good progress, as I’m already ready to insulate most of it.

Also, met up with Dennis Oelmann on Saturday and was able to check out his Cozy III as well as his shop.  I asked if I could sit in it, and he graciously said no problem.  It is certainly “cozy”, however doable.  I was surprised to see that the size of Dennis’ shop was actually a bit smaller than mine.  If he can build such quality products in a place smaller than mine, I certainly won’t have any excuses!  Dennis also offered to let me use his templates and jigs, and claims that that alone could save up to as much as a year off the build time!  Wow…  That’s awesome!  Dennis seems like a great guy, and I look forward to working with him in the future.

Advertisements

About Tarmac Grazer

I have recently purchased Cozy MK IV Plans #1627, and will be using this blog to log my build progress.
This entry was posted in 00. Preparation, Completed:. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s